Results per month
Topdays per month
| Inverter
| Wp
| Prognosis
| kWh/kWp
| realised
| kWh/kWp
| %
|
|---|
| Swanland1
| 4000
| 3320.000
| 830.0
| 2065.959
| 516.5
| 62.2%
|
| Added
| 4000
| 3320.000
|
| 2065.959
|
|
|
| Month
| Yield (kWh)
| Wp
| kWh/kWp
| Co2 (Kg)
| Savings
| %
|
|---|
| 1
| 43.067
| 4000
| 10.8
| 19.918
| £ 45.78
| 2.1
|
| 2
| 94.327
| 4000
| 23.6
| 43.626
| £ 100.29
| 4.6
|
| 3
| 321.940
| 4000
| 80.5
| 148.897
| £ 342.27
| 15.6
|
| 4
| 508.652
| 4000
| 127.2
| 235.252
| £ 519.67
| 24.6
|
| 5
| 520.936
| 4000
| 130.2
| 240.933
| £ 552.21
| 25.2
|
| 6
| 488.859
| 4000
| 122.2
| 226.097
| £ 498.84
| 23.7
|
| 7
| 88.178
| 4000
| 22.0
| 40.782
| £ 0.00
| 4.3
|
| Added
| 2065.959
|
|
| 955.506
| £ 2059.07
|
|